TUMBLEWHEEL STUDIOS
  • HOME
  • ABOUT
  • SUPPORT
  • PROJECTS
    • "IT'S NEVER TOO LATE!"
    • MURALS >
      • Coloring Carbon County - Belfry Water Tank
      • Columbia Pacific Food Bank
      • Scappoose Library
  • WORKSHOPS
  • THE MAKING OF
  • CONTACT

Nothing Like Watching Paint Dry

6/11/2018

0 Comments

 
With the floor completely clean and all holes patched, we moved onto the next phase - painting the floor with a coat of Rustoleum Rust Stopper. It was remarkable how giving the floor that unifying coat made it feel brand new and opened up a world of imaginative possibilities.
0 Comments

Heater Removal

6/11/2018

0 Comments

 
We took advantage of the few hours of sunshine one day to remove the rear heater. This entailed unbolting it from the back of the bus, hauling it and its 35 feet worth of radiator tubing out the front door, cutting the lines, and draining the fluid. With two people (and extra buckets) it wasn't so bad.
0 Comments

Rust Converter and Patching Holes

6/11/2018

1 Comment

 
With the plywood up, we were able to properly asses the condition of the metal frame and were happy to find there weren't any gaping holes or excessive cancer spots. After sanding the larger rusted spots with a wire brush attachment for the angle grinder, we applied a few coats of rust converter to the entire floor of the bus. Rust converter is a chemical solution that can be applied directly to an iron or iron alloy surface to convert iron oxides (rust) into a protective chemical barrier. Once dry, we used wall patch mesh (with adhesive backing) and caulk to patch all the bolt and nail holes.  
1 Comment

Bus Dog Lou

6/11/2018

0 Comments

 
Picture
0 Comments

Many. Tiny. Nails.

6/11/2018

1 Comment

 
Picture
As it turned out, the plywood subfloor was not only held in place by pressure, there were more tiny nails than I could care to count, driven in at random, anchoring it to the metal frame. Always wear safety goggles.
1 Comment

Rivets and Metal Siding

6/11/2018

0 Comments

 
After removing seats, the next step was to rip up the rubber flooring in order to expose the plywood subfloor. Upon seeing the rotted condition of the wood, it was obvious there had been water damage, and that there could be some rust issues. In a project like this, it's important not to cut any corners, so we tore up the subfloor and took Eva all the way down to her metal frame in order to start from scratch. 

At this time we also removed the metal siding on the walls. This tedious process involved drilling out each rivet with a drill bit that was slightly larger  than the center pin hole, and chiseling the head loose. 
0 Comments

No Seats = Increased Fetch Space

6/11/2018

0 Comments

 
Picture
Obligatory cute shot of Bus Dog Lou... because... why not?
0 Comments
Forward>>

    Archives

    January 2020
    June 2018
    April 2018

    Categories

    All

    RSS Feed

Location

Follow Us!

Donate to our charity with Amazon SMILE!

  • HOME
  • ABOUT
  • SUPPORT
  • PROJECTS
    • "IT'S NEVER TOO LATE!"
    • MURALS >
      • Coloring Carbon County - Belfry Water Tank
      • Columbia Pacific Food Bank
      • Scappoose Library
  • WORKSHOPS
  • THE MAKING OF
  • CONTACT